Legal
Terms of use
The terms on which Backyard Studio Lab is published.
Using this site
You are welcome to read, link to, quote and share anything published here. Please do not scrape the site at a rate that degrades it for other readers, attempt to break into it, or republish articles in full without permission.
Ownership
Articles, illustrations and the design of this site are the property of the publisher unless stated otherwise. Short quotations with a link back are fine and need no permission. Reproducing a whole article does need it.
Accuracy, and its limits
Articles are researched carefully and corrected when they turn out to be wrong, but they are published as general information rather than professional advice. Building codes, product specifications, prices and regulations vary by place and change over time.
Where an article touches on regulated work (anything structural, electrical, plumbing, or otherwise subject to permit), treat it as background reading and consult a qualified professional and your local authority before acting on it.
Links to other sites
Links to third-party sites are provided because they were useful at the time of writing. We do not control them and are not responsible for their content or their handling of your data.
Liability
This site is provided as-is. To the extent the law allows, the publisher is not liable for loss arising from use of it or reliance on anything in it.
Corrections
If something here is wrong, please say so. Corrections are welcome and are made promptly. Write to editor@backyardstudiolab.com.
Changes
These terms may be updated. The date at the top of the page shows when they last changed.