Features
Pay for a backyard studio build by milestone, not by date
A backyard studio build pays out in a set order: design, permit, deposit, materials, foundation and shell draws, then a holdback. Tie each one to a milestone.
Topic
Features
A backyard studio build pays out in a set order: design, permit, deposit, materials, foundation and shell draws, then a holdback. Tie each one to a milestone.